What's included
- Refrigeration assembly: piping, insulation and interconnections
- Electrical assembly and control panels
- Automation and instrumentation: controls, sensors and alarms
- Leak, vacuum and refrigerant charge tests
- Commissioning with performance validation against design parameters
Where problems in a new system start
Many failures in a new system start during installation: undersized or uninsulated piping, contaminated brazing, incomplete evacuation or a refrigerant charge outside specification. They do not always show up at start-up; months later they appear as high consumption, ice on the evaporator or a compressor working harder than it should.
That is why installation ends with commissioning: documented measurements and tests that compare actual performance with the design parameters. That record becomes the reference for maintenance in the years that follow.
How it works
-
Design review (ours or third-party) and site planning
-
Assembly with our own field team
-
Leak and vacuum tests, assisted start-up
-
Commissioning: measurements and tests documented against the agreed acceptance criteria
What to have at hand when requesting an installation
- The design, your own or a third party’s, or the requirement: product, temperature and capacity
- The site: dimensions, access and where the outdoor units will go
- The available electrical infrastructure
- The desired timeline and the windows when the operation can host the work
Who it is for
- New builds: cold rooms, DCs, processing plants
- Expansions and system replacements in running operations
- Teams with a third-party design that need execution with technical accountability
FAQ
Do you only service Smart Cold equipment?
No. We service equipment from any manufacturer. For Smart Cold equipment, we are the only factory-authorized service provider.
Do you install third-party designs?
Yes. We review the design, flag risks if any, and execute with full commissioning. If you prefer, we also develop the design, see Design & engineering.
What is performance-validated commissioning?
We measure operating temperature, pressures and energy consumption and compare them with the design parameters. Results and any required adjustments are documented for assessment against the agreed acceptance criteria.
How long does a cold room installation take?
It depends on the size, the system and site conditions. The timeline is set when planning the work, after reviewing the design.
Do you handle the electrical work and automation?
Yes. Electrical installation, control panels, controls, sensors and alarms are part of the installation.
What are the leak and vacuum tests for?
The leak test confirms the circuit does not leak, with the system pressurized before charging. Evacuation removes air and moisture from the piping, which would harm the refrigerant and the compressor oil. Only then is the refrigerant charged.
Let's plan your installation
Tell us the city and state, the project stage and your desired installation schedule.